PETROKEMYA – SAUDI KAYAN
Pipeline Project
Date of Commencement:
Oct 2012
Client
Petrokemya -Saudi Kayan
Main Contractor:
Waterwag Consultant – Netherlands
Construction Contractor:
Sinopec
Scope of Workt
Front End Engineering & Detailed
Engineering Design:
Process.
Civil / Structure.
Mechanical / Piping.
Electrical.
Instrumentation & Control.
Project Description
Install 8” Export Pipeline to Transfer the Product From
PK to Saudi Kayan.
Products – HC Liquid.
The total length of the pipe line bet. PETROKEMYA and
Saudi Kayan within RC corridor is approximately 15 km.
Installation of one additional pump at Petrokemya.
Installation of one new compressor at Saudi Kayan.
Tie-ins and interfaces in existing MCCs in Substation.
Evaluation of strength and integrity of the supporting
structural elements for installation of new equipment.
Power, Signal, Air, DCS-PLC I/ OS, Control network and
system topology.